The City of Steinbach has announced that its annual sewer cleaning and televising throughout Steinbach will take place starting Monday, October 7 until Tuesday, October 15, 2024. During this time, nearly 8,000 metres of pipe will be cleaned and televised.

The work is routine preventative maintenance of the sanitary sewer system. Sections to be cleaned are determined based on information gained during monthly inspections, last cleaning or televising date, and critical level of service. The pipes are cleaned by a high-pressure flushing system that runs fresh water through the lines to clear away any sedimentary deposits. Vacuum trucks pick up water and sediments further down the line. A remote-controlled self-propelled camera vehicle is then sent through to inspect the line and ensure that the pipes are clean, and the infrastructure is in good condition.

Affected residents will receive a courtesy notification on their door before their street is worked on. The work may take place anytime during the two days following receipt of the notice. If any problems are identified, another notice will be given at that time. The city thanks all residents in advance for their cooperation with the maintenance of our wastewater infrastructure.

The following is the list of streets that the City is focusing on this year, sorted by expected start date:

Monday, October 7

  • Home Street
  • Hospital Street
  • Hanover Street (Elm Avenue to Reimer Avenue)

Tuesday, October 8

  • Hanover Street (174 to Elm Avenue)
  • Elm Avenue
  • Reimer Avenue (First Street to Third Street)
  • PTH 52 West (Main Street to First Street)

Wednesday, October 9

  • Coral Cres (Brandt Street to Giesbrecht Street)
  • Lilac Bay

Thursday, October 10

  • Coral Crescent (107 to Giesbrecht Street)
  • Rose Street
  • Giesbrecht Street (Woodhaven Avenue to Donald Avenue)

Friday, October 11

  • Giesbrecht Street (Donald Street to First Street)
  • Coverdale Street
  • Westdale Street
  • Donald Avenue
  • Maplewood Street (Loewen Boulevard to Stonebridge Crossing)

Tuesday, October 15

  • Park Road West (PTH 12 N to Stonebridge Crossing)

Sewer lines on some other streets may be cleaned if time and budget allow. Houses along those streets will be notified in advance.

If your street is listed above, you will receive notice before the work takes place. Homeowners should take the following precautions:

  • Cover all toilet bowls (under the lid) with saran wrap to prevent water from spraying in some cases where the vent might be plugged, or the main lines are extremely dirty.
  • Sinks & bathtubs – Insert the plugs (in all sinks and bathtubs)
  • Floor traps in the basement – Place a piece of plastic under the cover and put something heavy on top of the trap.
  • Odours – If you experience an unpleasant odour in your house after the flushing process, run some water in all sinks with traps, flush the toilet, pour some water into the floor trap in the basement and open the windows for a short period of time. This should eliminate the odour.

For more information on the City’s sewer cleaning inspection program, visit steinbach.ca.

Should you require any further information, please contact the City’s Waterworks Department at 204-346-6211, between 8am to 5pm, and 204-346-6232 after 5pm. If you do not get an answer, please leave a message with your contact information so that a staff member can call you back.