Posted on 04/26/2015, 1:00 pm, by mySteinbach

Manitoba Infrastructure and Transportation advises motorists of a temporary detour of traffic along PTH 12 at PTH 59, the Grand Beach Access, from April 28 to May 14 to complete the realignment of the intersection.

PTH 12 traffic will be detoured along Fey Road. The detour is approximately one kilometre north of the existing PTH 12 Grand Beach Access. Motorists will still have access to cottages and the beaches. Southbound traffic on PTH 59 will use the newly constructed southbound lane and there will be no change for PTH 59 northbound traffic.

Portable electronic message boards and detour signage will be in place during construction. The newly realigned intersection is planned to be opened to traffic before the long weekend in May.

Motorists are also reminded to slow down and use caution approaching and in construction zones for their own safety and the safety of workers. The latest information on lane closures and road conditions is available anytime toll-free at 511, at www.manitoba511.ca.